Documents & Installation Guides

Everything you need to install, operate, and maintain your Aqua-Air Wet/Dry system. Click any document to download the PDF.

Installation, step by step

Short silent animations. Swipe or scroll to see all 16.

  • Step 1Planning and layout

  • Step 2Mount the power unit

  • Step 3Dual-canister mount

  • Step 4Intake and exhaust

  • Steps 5, 6, 10, 11 & 14Pipe, water outlets and trim-out

  • Step 7Tees and the 2.5in drop

  • Step 8P-traps and high points

  • Step 9Inlet rough-in

  • Step 12Control wire

  • Step 13Protect and inspect before drywall

  • Step 15Drain

  • Step 16Water supply

  • Step 17Electrical

  • Step 18Chemical injectors

  • Step 19Start-up and testing

  • Step 20Hand-over

Need a document you don’t see here? Call 1-800-916-5777 or contact us.